设为首页 设为收藏

联系方式

 

洛阳松导感应加热科技有限公司 

联系方式:15038554363  

24小时技术热线:15038554363

邮 箱:1390003299@qq.com

厂址:河南省洛阳市洛新工业园区

  • 产品
  • 梯形铝锭在线提温设备

    0.2T中频定点浇注炉

    钢坯加热炉

    超高温烧结炉

    钢管在线加热及保温装置

    40KW感应加热取暖炉

    氮化硼专用中频加热线圈

    电机端环焊接设备

    电机转子导条焊机设备

    5吨中频炉熔化铸铁

    底出水熔铝炉

    侧下出水中频炉

    0.2吨铜雾化定点浇注炉

    3吨中频炉熔化铸钢件

    3吨中频炉熔化废铝

    3吨中频炉2500kw熔化铸铁

    1吨中频炉熔化铸铁件专用炉

    1吨12脉一拖二中频炉

    2吨中频炉用熔化铸钢件

    铸铁件1吨中频炉

    2吨铸造中频炉

    铸造1吨中频炉

    1.5吨钢壳液压中频炉

    1.5吨钢壳液压定点浇注炉

    3吨串联逆变中频炉

    圆钢感应加热炉

    铝棒感应加热炉

    方钢感应加热炉

    中频电炉维修
    分享到:
        本文为技术资料或者文章来自网络,仅供参考学习,如涉嫌侵权,请告知删除
        

     

     

     

    中频炉逆变电路不能启动或启动困难的维修(英文版)

    ault phenomenon of induction melting furnace

    The inverter circuit of the IF power supply cannot be started or started up.

    Fault analysis and processing

    The main reason why the inverter circuit of the IF power supply cannot be started or started is as follows.

        (1) Short circuit between induction coils. If the induction coil does not cool well for a long time, the insulation is broken and a short circuit between turns is caused. Conductive materials such as dust and scale on the induction coil can also cause short-circuit between turns. When the intermediate frequency power supply is started, the ignition phenomenon occurs, and frequent ignition may cause the induction coil to break down. In this case, the surface of the induction coil should be cleaned, brushed with insulating paint or asbestos board.

        (2) The induction coil is short-circuited to the arc furnace casing. The induction coil housing is loose and there is too much ash in the furnace; the induction coil is discharged through the furnace base. In this case, the induction coil should be reinforced to remove dust.

        (3) The copper busbar connected to the induction coil at the intermediate frequency output is short-circuited. If there is a foreign object or the copper is not fixed, it may cause a short circuit between the copper rows.

        (4) The capacitor case is short-circuited to the ground. At this time, it should be checked whether there is water leakage, whether the capacitor base is too dusty, and whether the ceramic base of the capacitor is missing.

        (5) The water-cooled cable is disconnected, and the copper bus that is output to the load is blown.

        (6) Check if the current transformer insulation is damaged; remove the current transformer to check whether the insulation is good; use a multimeter to measure whether the coil is blown, and check if the wiring sequence is correct. If both are normal, check whether the potentiometer of the current signal adjustment is too small. The amplitude of the output current signal should be re-adjusted.

    (7) Check if the inverter circuit's inverter angle is too small. If it is too small, adjust the inverter angle; if it is normal, check if the current polarity is reversed. If not, check the inverter thyristor for a trigger pulse. If it is normal, check the inverter thyristor for damage. If it is damaged, replace it with a thyristor of the same type and specification.

    http://www.firstfurnace.com/BdwlkjNews.asp?id=1398

     


    Copyright© 2007-2013洛阳松导感应加热科技有限公司 All Rights Reserved 
    手 机:15038554363
    本站关键词:中频炉、中频电炉、熔炼炉